The machine brings the first block of the track switch | |
The new track switch block brought shall be backed out to the tunnel wall | |
The old block shall be put vertically and backed out to the opposite wall of the tunnel | |
The new block is laid to the ground | |
The machine shall be set to transport position and sent to the nearest station |
1. | 2. |
3. | 4. |