in russian switch to english
feedback пїЅпїЅпїЅпїЅпїЅпїЅпїЅпїЅ пїЅпїЅпїЅпїЅпїЅ
Laying Machine for Replacing Switch and Railway Section on Surface and Underground Railways

Effectiveness

The machine is effective in resolving the problems of replacement of old railway sections in underground, increase train traffic safety. It is enables you to increase labor productivity in the following sectors:

Ecology

During night shifts in underground there are emission fumes from locomotives equipped with petrol or diesel engines. Using the machine will allow to replace such a trains and reduce pollution inside tunnels.

Fire safety

Recent disaster in Alp tunnel caused by 20 liter fuel canister demonstrates danger of usage petrol/diesel fuel transport underground

Mechanization and reducing of manual labor

The machine mechanizes and reduces manual labor in following major fields:

  • Replacement of switches.
  • Replacement of single/individual rails.
  • Replacement of railway ties and beams.
  • Replacement of contact rails.

Cost-effectiveness

The replacement of switches by whole part enables to carry all major works to assemble switches during daytime at special site/stand.

For example, taking recent practice of Moscow Underground, one technician is replacing 1.2 meters of switching beams per a shift working in a tunnel. Bearing in mind, that whole beam length on a 1/9 type switch is 250 meters, it needs 280 technician shifts for replacement. Replacement of metal parts of the switch requires another 40 shifts. Total: 248 shifts.

Same job can be done in 68 shifts when using the machine. So we are saving 180 shifts per one switch replacement. Moscow Underground recently replacing 20 switches per year.

Return on Investment Terms

Worker salary per month,
Worker salary per shift,
Savings on replacement of 1 switch
Savings on replacement of 10 switches,
Savings on replacement of 20 switches,
Return on investment term from 500,000 cost
On replacement of 10 switches On replacement of 20 switches
300 (Moscow) 15 2700 27000 54000 18 years 9 years
2000 90 16200 162000 324000 3 years 1.5 years
3000 136 24480 244800 489000 2 years 1 year

The new know-how practice of rail track repair works using the machine in underground and tunnels will leads to considerable savings and work quality improvement.