Laying Machine for Replacing Switch and Railway Section on Surface and Underground Railways

Area of Usage

  1. Transportation and replacement of switches, cross switches and girder-type crossings of all types and makes in subways and railways including in difficult conditions of station bottlenecks and sorting hills;
  2. Replacement of individual railway sections on timber or concrete ties on railways and industrial transport tracks;
  3. Replacement of an individual contact rail in subways;
  4. Transportation and laying switches in place of a temporary railway and subway tracks during construction period;
  5. Transportation and laying compensating devices and individual rails on bridges and the rails between spans of the jointless tracks of a railway;
  6. Replacement of switches and individual components of switches in winter and in case on both sides of a replaced switch there are buildings or freight on branch tracks or industrial transport tracks or if the switch must be lifted on a different level;
  7. Replacement of switching beams under raised (200 - 300 mm) metal parts of a switch in difficult conditions of railways and subway tunnels switches and junctions;
  8. Reconstruction in subways with laying up to 50 meters of tracks after fire or train crushing; transporting ties, rails, including contact rails, electrical cables and automatic block systems to the site of works;

Principle of work of the machine on replacement of switch bars or cross ties in tunnels

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 Phase 8

Principle of work of the machine at replacement of switch metal parts